A landed house in Singapore still needs a structural Professional Engineer when the work is more than finishes and fittings. Additions and alterations (A&A), reconstruction, and a new house each go to the Building and Construction Authority (BCA) as a structural submission. Only a Professional Engineer (PE) who is the Qualified Person (QP) for structural works can sign that submission.

MTECH Consultants prepares the structural design and makes that submission. Ivan Phuah is the PE who endorses it. This note covers when the Urban Redevelopment Authority (URA) still treats the job as A&A, what BCA actually approves, and what we will not invent a fee or a duration for. To appoint us, go to the landed house PE page.

A&A or reconstruction: the 50% rule

URA decides whether work to an existing landed house is A&A or reconstruction. BCA does not make that call. The tests sit in URA's landed housing handbook. The bungalow, semi-detached and terrace pages were last updated on 7 June 2026.

On those pages, a proposal qualifies as A&A only when all of the following are true:

  • Additional gross floor area (GFA) does not exceed 50% of the approved GFA.
  • External walls that are removed and replaced with new walls do not exceed 50% of the approved external walls.
  • Structural changes (replacing or constructing new columns or beams, and reconstructing existing floor slabs) do not exceed 50% of the existing building.
  • Replacing the whole roof, even where the height changes, does not add a storey.
  • Where an attic is added, the increase in GFA is less than 50%. The attic test is "less than 50%", not "up to 50%".

If the proposal fails any of these, URA treats it as reconstruction.

Two outcomes are reconstruction even when the added GFA stays within 50%:

  • An increase in storey height, including a roof change that adds a storey.
  • A change of housing form, for example from a semi-detached house to a bungalow, or from a semi-detached house to a detached house.

Form DC 6 is the A&A application form. Its explanatory notes were last updated on 13 July 2026. They are not the same sentences as the handbook. On external walls, the form says less than 50% of the existing external walls may be removed or replaced, and replacement of doors and windows is left out of that count. The handbook says walls removed and replaced shall not exceed 50% of the approved external walls. We measure the drawings against both before we call the job A&A. The form also states that demolishing the entire house is a new erection, not a reconstruction.

These percentages are taken off the approved building, not off a walk around the site. A wall that looks like a small part of the renovation can still push the wall count or the structural-change count over the line. We check that against the approved plans before the architect freezes the scheme.

If the house was approved under older landed-housing guidelines, new A&A work still has to fit the current envelope control guidelines. Where the existing house is already outside that envelope, URA will not accept new work that increases the bulk further.

Keeping a part of the house that does not meet today's guidelines is a separate URA concession. It is not automatic. URA may allow it on A&A or reconstruction only if, among other conditions, at least 25% of the existing floor plate is retained as one integrated wing of columns, beams, slab and external walls, and a PE certifies that the structure to be retained is sound, can take the new work, and will be protected during construction. Where the existing front setback is already short, URA also requires a minimum 2.4 m setback from the front boundary. Read the conditions on the handbook page for the house type, not from this summary alone:

PE endorsement and BCA structural submission

Planning category and structural approval are different steps. After the job is A&A, reconstruction or a new erection, the structural plans still have to be approved.

Only a QP who is a PE registered in the civil or structural discipline can apply to BCA for structural plan approval. The set is the structural plans, the calculations, and the architectural plans for reference, with URA planning permission or the lodgement receipt. BCA sets this out under structural plan submission.

BCA's published service standard is 7 working days for a structural plan application without an accredited checker's certificate, once the documents are complete. That is BCA's clock, not ours. A written direction, a missing planning document, or a design that has to change adds time. Submissions that need an accredited checker, or that go in through CORENET X as part of a Construction Gateway, are on a different published timing. Use BCA's page for the current standard.

Plan approval is not permission to start. A permit to carry out structural works has to be in place before structural work begins. The developer, the QP and the builder apply for it together, either with the plan application or after approval. BCA's page is permit for structural works.

On an A&A or reconstruction, the endorsement covers the part of the house that stays, not only the new members. We have to be satisfied that the retained structure can carry the new loads, and the submission says so. Where URA asks for a PE certification of structure to be retained, that certification is part of this scope.

When the structural works are done, the QP for supervision and the QP for design submit the supervision certificates and the record structural plans (the C forms). You still cannot occupy the house on those certificates alone. The project QP applies for a Temporary Occupation Permit (TOP) or a Certificate of Statutory Completion (CSC) after the agency clearances are in. See BCA's application for TOP/CSC.

MTECH prepares and endorses the structural design and submits it to BCA. The architect remains QP for the building plans. The builder joins the permit application. We coordinate with them. We do not replace them.

If you want this scope, start at landed house PE. The wider practice is on services, including PE endorsement for work that is not a full house submission. Houses already submitted are in the project portfolio.

What it costs and how long it takes

The fee depends on the scope and on the existing structure. Contact MTECH Consultants for a quote.

What changes it:

  • Whether the job is A&A, reconstruction, or a new house
  • A basement, an attic, or a swimming pool
  • How much of the existing structure is kept, and whether as-built drawings exist
  • Whether a soil investigation has already been done
  • ERSS, or any excavation that needs its own submission
  • How many design changes come after the first issue

Timing depends on the scope and on authority processing. Contact MTECH Consultants to discuss it.

If architectural drawings exist, send them with the address through the contact page. We will say whether the job still sits inside the A&A tests, and what we need in order to quote.

Frequently asked questions

Do I need a PE for A&A on a landed house?

You need a PE if the work requires BCA structural plan approval. Only a QP who is a PE in the civil or structural discipline can make that application. Replacing finishes, or work that does not touch the structure, may sit outside that submission. If you are removing a wall, extending a floor, adding a storey, or rebuilding part of the frame, treat a PE as required until the structure has been checked.

What is the difference between A&A and reconstruction?

URA treats the proposal as A&A only while the added GFA, the external walls replaced, and the structural changes stay inside the tests above, and you are not adding a storey or changing the housing form. If any test fails, it is reconstruction. Demolishing the whole house is a new erection. The handbook pages and Form DC 6, linked above, are the documents to check, because the wall test is worded differently on the form and in the handbook.

Who submits the structural plans to BCA?

The structural QP, who has to be a PE. At MTECH, Ivan Phuah endorses that submission. The architect remains QP for the building plans. The permit to carry out structural works is a joint application by the developer, the QP and the builder.

What is the permit to commence structural works?

BCA calls it a permit to carry out structural works. Approval of the plans is not permission to start. The permit is applied for with the plans or after they are approved, by the developer, the QP and the builder together. The BCA permit page is linked above.

Do you certify structure that is being retained?

Yes, when we are the structural QP. On A&A and reconstruction we check the part of the house that stays and we endorse that it can take the new work. If you also need URA's concession to keep a non-conforming part, URA asks for a PE certification that the retained structure is sound and will be protected during construction. That certification is part of the same appointment, not a separate product.

How much does it cost and how long does it take?

The fee depends on the scope and on the existing structure. Contact MTECH Consultants for a quote. Timing depends on the scope and on authority processing. Contact MTECH Consultants to discuss it.